From first call to paid invoice
v1 · invite-only

The 5-step walkthrough

How residential job ops actually run on Crewridge.

The five loops your crews keep losing in inboxes and notebooks — answered phone, sequenced subs, chased permits, daily photo updates to the homeowner, and closeout invoicing — wired into one seat between the truck, the phone, and the permit office. Scroll for the full walkthrough.

Read in ~90 seconds · one CTA at the end

In this walkthrough

  1. 01Inbound
  2. 02Crew
  3. 03Permits
  4. 04Homeowner
  5. 05Closeout
01

Inbound

Phone rings at 11pm → AI voice books the estimate.

The voice agent picks up after-hours like a sharp office manager — not a switchboard. It asks the scoping questions an estimator would (fixtures, layout, budget, timing), reads your real calendar, and books the on-site estimate before the homeowner thinks to hang up. Missed rings stop being your pipeline problem.

Live call · inbound · 7:42 pm
02

Crew

Sub + material scheduling.

Tiling subs, countertop fabricators, material drops — sequenced against the master schedule and rescheduled the moment a crew slips. Not the morning of, when the truck is already on the highway. The owner gets a daily digest of what moved; the homeowner gets the date that actually holds.

Today · Hall bath dispatch — Tuesday 7:30 am
03

Permits

Permits + inspections chased.

Clerk filings tracked as their own workflow — first-class, not a note in the back of a planner. Renewal dates, failed inspections, surprise re-checks all surface before they cost a day on site. The 14-day permit-to-inspection gap is the gap crews running 5–50 keep citing; Crewridge closes it.

Permit timeline · filed → reviewed → scheduled
04

Homeowner

Daily homeowner photo updates.

End-of-day photos go to the client automatically with a one-line status, before the truck is parked. No more 9pm "any update?" texts while you are still unloading drywall. They see the work; you stop being the broadcast tower. On Pro, a 7-day AI summary goes out alongside the photos so the homeowner tracks the arc, not just the day.

Today's photos · Mrs. Adler — kitchen reno
05

Closeout

Change orders close → Stripe invoice paid.

Signed change orders and closeout invoices dispatched through Stripe — paid before the truck is parked for the season. The chase for signed change orders (and the deposit that should travel with them) becomes a tracked queue instead of a memory test. Final paperwork goes automatically; the margin that the line earned rides for free.

Stripe invoice · change order · deposit received

Pick the tier · ship in two weeks

Pick the plan that fits one crew today.

Three plans, one operations layer. Starter covers the four working loops; Pro adds the follow-up + draws; Crew scales to three lines. Two weeks from kickoff to live, pointing at your existing number.